Skip to main content
Full Schedule
Browse By Title
Browse by Track
Browse By Presenter
Browse By Session
Browse by Poster Title
Committee Meetings
My Conference Profile
My Plan
Toggle navigation
Search
Home
Full Schedule
Browse By Title
Browse by Track
Browse By Presenter
Browse By Session
Browse by Poster Title
Committee Meetings
My Conference Profile
My Plan
Full Schedule
All Days
Sun, Jun 1
Mon, Jun 2
Tue, Jun 3
Wed, Jun 4
Thu, Jun 5
Full Schedule
45 results found
Type here to filter the list
Wednesday, June 4, 2025
8:00 AM – 8:30 AM
East Coast USA Time
Speaker & Moderator Breakfast
8:00 AM – 11:00 AM
East Coast USA Time
Registration Open
8:00 AM – 12:00 PM
East Coast USA Time
Exhibit Hall Open
8:30 AM – 10:00 AM
East Coast USA Time
8A: Port Engineering
Noah J. Elwood, P.E., BC.OE, BC.PE
– Appledore Marine Engineering, LLC
8:30 AM – 8:50 AM
East Coast USA Time
Service Life Estimation for Waterfront Repairs and Rehabilitation
Zachary D. Jenkins, P.E., S.E.
– Collins Engineers, Inc.
Derek Gallagher, P.E., C.W.I
– Collins Engineers, Inc.
David Arpin, P.E.
– US Coast Guard CEU Providence
Port Engineering
8:50 AM – 9:10 AM
East Coast USA Time
Optimize the Data Collection for the Service-life Prediction of Concrete Port Infrastructure
Henk Voogt, Aff.M.ASCE
– Port of Rotterdam
Eric Samson, Eng., Ph.D. (he/him/his)
– SIMCO Technologies
Port Engineering
9:10 AM – 9:30 AM
East Coast USA Time
Evaluating Deteriorated Marine Structures with Limited Remaining Service Life
Rune Iversen, P.E., M.ASCE
– Simpson Gumpertz & Heger Inc.
Dara Karac
– Simpson Gumpertz & Heger
Rebecca Maloney, P.E.
– Simpson Gumpertz & Heger
Port Engineering
9:30 AM – 9:50 AM
East Coast USA Time
Waterfront Facilities Inspection and Assessment–Manual of Practice No. 130: Major Changes & Updates
Danielle Somma, P.E. (ME, CT), M.ASCE (she/her/hers)
– Appledore Marine Engineering, LLC
Noah J. Elwood, P.E., BC.OE, BC.PE
– Appledore Marine Engineering, LLC
Brian L. Phan, P.E.
– Simpson Gumpertz & Heger Inc.
Kirk F. Riden, P.E.
– Appledore Marine Engineering, LLC
Matthew Leonard Teeden, P.E., S.E., BC.OE, BC.PE, M.ASCE
– Appledore Marine Engineering, LLC
Port Engineering
8:30 AM – 10:00 AM
East Coast USA Time
8B: Port Engineering
Paul A. Harren, ME
– General Dynamics Electric Boat
8:30 AM – 8:50 AM
East Coast USA Time
NAVFAC Drydock Emergency Repairs: Fast, Flawless Delivery via Innovative and Fully Integrated Design
Claudio Osses, P.E., SE
– Kiewit
Kristine Majlath
– Kiewit
Gregory Fischer, Ph.D., P.E.
– Shannon & Wilson
John Brestin, P.E., SE
– Kiewit
Port Engineering
8:50 AM – 9:10 AM
East Coast USA Time
NAVFAC Drydock Emergency Repairs: Finite Element Analyses Confirmed Design Solution in Real Time
Gregory Fischer, Ph.D., P.E.
– Shannon & Wilson
Samuel X. Yao, M.ASCE
– Simpson Gumpertz & Heger Inc.
Michael J. O'Sullivan, P.E., S.E., M.ASCE
– COWI North America, Inc
Christoffer Brodbaek, P.E.
– COWI
John Brestin, P.E., SE
– Kiewit
Port Engineering
9:10 AM – 9:30 AM
East Coast USA Time
UFC Comprehensive General Dry Dock Seismic Analysis Methodology
Omar A. Jaradat, Ph.D., P.E., BC.PE., M.ASCE
– Moffatt & Nichol
Jason Hong, P.E.
– Moffatt & Nichol
Patrick Wilson, Ph.D., P.E.
– Earth Mechanics, Inc.
Arul K. Arulmoli, Ph.D., P.E., G.E., F.ASCE
– Earth Mechanics, Inc.
Patrick Chang, P.E.
– Moffatt & Nichol
TJ Schilling
– Moffatt & Nichol
Amin Rahmani, Ph.D., P.E., P.Eng., G.E., M.ASCE
– Earth Mechanics Inc.
Anthony L. Farmer, P.E., M.ASCE
– NAVFAC Atlantic
John T. Wells, P.E.
– NAVFAC Atlantic
Port Engineering
9:30 AM – 9:50 AM
East Coast USA Time
Soil Structure Interaction and Its Impact on Seismic Analysis of Dry Docks
Scott Williams, P.E., SE
– WSP USA Inc.
Long Chen, Ph.D., P.E.
– Haley & Aldrich
Port Engineering
8:30 AM – 10:00 AM
East Coast USA Time
8C: Port Planning & Operations; Terminal Planning & Design
Damon Jericho
8:30 AM – 8:50 AM
East Coast USA Time
Considerations for the Design of Fully Automated Container Yards Based on a Case Study
Alfredo Rivera, P.E., ENV SP
– Simpson Gumpertz & Heger Inc.
Justin Reynolds, P.E., M.ASCE (he/him/his)
– Simpson Gumpertz & Heger Inc.
Julian Rosales
– Instrumentacion Tecnica
Carlos E. Ospina, PhD, P.E.
– Simpson Gumpertz & Heger Inc.
Manfred Zinserling, P.E., SE, M.ASCE
– Manfred Zinserling
Terminal Planning & Design
8:50 AM – 9:10 AM
East Coast USA Time
Turning Basin Terminal Optimization Study
Hardik M. Gajjar, ENV SP
– WSP USA
Port Planning & Operations
9:10 AM – 9:30 AM
East Coast USA Time
Why GIS? The Pier B Programs Solution Managing Large Quantities of Data
Myles Harrold, P.E. (he/him/his)
– HDR
Joel Aguilar, P.E., S.E., M.ASCE
– Port of Long Beach
Yuying Li, PA
– HDR
Try V. Khou, P.E.
– HDR
Norisa Abelgas, P.E., M.ASCE
– Port of Long Beach
Port Engineering
9:30 AM – 9:50 AM
East Coast USA Time
Geospatial Technologies in Action at the Port of Long Beach
Miguel Angel Hernandez
– Port of Long Beach
Suzanne Vachon, ENV SP (she/her/hers)
– Port of Long Beach
Port Engineering
8:30 AM – 10:00 AM
East Coast USA Time
8D: Environmental
Matthew Leonard Teeden, P.E., S.E., BC.OE, BC.PE, M.ASCE
– Appledore Marine Engineering, LLC
8:30 AM – 8:50 AM
East Coast USA Time
Living Breakwaters: Transforming Coastal Resilience and Ecosystem Health in Southern Staten Island
Kevin A. Robinson (he/him/his)
– Weeks Marine
Kristine Majlath
– Kiewit
Joseph Silva, P.E.
– COWI
Pippa Brashear
– SCAPE
Other
8:50 AM – 9:10 AM
East Coast USA Time
A Case Study of Major Urban Coastal Resilience: The Battery
Greg Sprich, P.E.
– Stantec
Matthew A. McCarty, P.E., S.E., M.ASCE
– Stantec
Environmental
9:10 AM – 9:30 AM
East Coast USA Time
Urban Waterfront Placemaking – Creating Improved Public Space on an Old Municipal Pier
Julia Shockley, P.E.
– Moffatt & Nichol
Jana Roy
– Moffatt & Nichol
Matthew N. Martinez, S.E., P.E., BC.PE
– Moffatt & Nichol
Environmental
9:30 AM – 9:50 AM
East Coast USA Time
The House of Seven Gables: Managed Retreat to Protect a National Historic Landmark
Allison P. Gilmore, P.E.
– Collins Engineers, Inc.
Julia DelTufo, P.E.
– Collins Engineers, Inc.
Environmental
8:30 AM – 10:00 AM
East Coast USA Time
8E: Local Session 2 - Port of New Bedford
Susan E. Nilson, PE (she/her/hers)
– Foth Infrastructure & Environment, LLC
8:30 AM – 10:00 AM
East Coast USA Time
Synchronized Success in the Port of New Bedford: Building a Portfolio of Port Infrastructure & Dredging Projects
Susan E. Nilson, PE (she/her/hers)
– Foth Infrastructure & Environment, LLC
Ceasar C. Duarte, Jr., MPE
– New Bedford Port Authority
Patrick Rezendes
– Foth Infrastructure & Environment, LLC
Bruce Carlisle
Andrew Saunders
Mark White
8:30 AM – 10:00 AM
East Coast USA Time
8G: Ports 101 - Geotechnical Engineering
Jon Benvenuto, P.E., PMP
– U.S. Coast Guard
8:30 AM – 8:50 AM
East Coast USA Time
Intro, Investigation and Testing
Benjamin Serna, PE, GE, M. ASCE
– Gannett Fleming
Ports 101
8:50 AM – 9:10 AM
East Coast USA Time
Ground Improvement
Jason Klegg
Ports 101
9:10 AM – 9:30 AM
East Coast USA Time
Advancements in Bulkhead Analysis and Design; Geotechnical Perspectives
Stephen E. Dickenson, Ph.D., P.E., BC.PE., M.ASCE
– New Albion Geotechnical
Ports 101
9:30 AM – 9:50 AM
East Coast USA Time
Advancements in Bulkhead Analysis and Design; Structural Perspectives
Stuart Stringer, P.E., S.E.
– Moffatt & Nichol
Ports 101
10:00 AM – 10:30 AM
East Coast USA Time
Networking Break in Exhibit Hall
10:30 AM – 12:00 PM
East Coast USA Time
9A: Port Engineering
Daniel Robbins, P.E.(NH)
– GEI Consultants, Inc.
10:30 AM – 10:50 AM
East Coast USA Time
Milwaukee DMMF – Tandem Sheet Pile Containment, Design and Construction
Brian Edward Shaw, P.E., SE
– Moffatt & Nichol
Mike Winters, P.E. (he/him/his)
– Moffatt & Nichol
Port Engineering
10:50 AM – 11:10 AM
East Coast USA Time
JAXPORT Bartram Island Cell C Restoration and Capacity Improvement
Jonathan T. Armbruster, P.E., MS
– Taylor Engineering, Inc
Port Engineering
11:10 AM – 11:30 AM
East Coast USA Time
Simultaneously Dredging Private Docks and a Federal Channel in an Urban Waterway...it Takes Villages
Scott M. Bodensteiner, M.S.
– Haley & Aldrich
April Miller
– City of San Rafael
Mike Angis, P.E.
– Haley & Aldrich
Navigation & Waterways
11:30 AM – 11:50 AM
East Coast USA Time
Guide for a Risk-Based Approach to Environmental Windows for Dredging and Navigation Infrastructure
Rebecca Desrosiers, P.E.
– Anchor QEA, Inc.
Gerard van Raalte
– Boskalis
David Petch
– GHD
Joshua van Berkel
– DHI Water & Environment Inc.
Other
10:30 AM – 12:00 PM
East Coast USA Time
9B: Port Engineering
Rune Iversen, P.E., M.ASCE
– Simpson Gumpertz & Heger Inc.
10:30 AM – 10:50 AM
East Coast USA Time
Development of Roll Stabilization for the Floating Dock at Port of Long Beach Fireboat Station 15
Claudio Fassardi
– Jacobs
Scott Dunn, Ph.D.
– Jacobs
Jack Gong, Ph.D., P.E., S.E., PMP, BC.PE
– Port of Long Beach
Port Engineering
10:50 AM – 11:10 AM
East Coast USA Time
The Role of Physical Modelling in a Port Expansion Project in a Complex Wave Environment
Paul E. Knox, M.Sc., P.Eng.
– National Research Council of Canada
Jeffrey Oskamp, P.E., P.Eng., M.ASCE
– Moffatt & Nichol
Patricio Monárdez
– Moffatt & NIchol
Edward Kennedy
– National Research Council of Canada
Port Engineering
11:10 AM – 11:30 AM
East Coast USA Time
Advanced Mooring Analysis – Matarani Port, Peru
Jeffrey Oskamp, P.E., P.Eng., M.ASCE
– Moffatt & Nichol
Patricio Monárdez
– Moffatt & NIchol
Paul E. Knox, M.Sc., P.Eng.
– National Research Council of Canada
Port Engineering
11:30 AM – 11:50 AM
East Coast USA Time
Engineering Practice of Ship Mooring Analysis
Xiao (Steven) Li, P.E., Ph.D.
– AECOM
Abbas Sarmad, P.E.
– AECOM
Port Engineering
10:30 AM – 12:00 PM
East Coast USA Time
9D: Environmental
Jonathan T. Armbruster, P.E., MS
– Taylor Engineering, Inc
10:30 AM – 10:50 AM
East Coast USA Time
A Case Study and Recommendations for Passenger Ferry Electrification and Berthing Upgrades
Matthew A. McCarty, P.E., S.E., M.ASCE
– Stantec
Bill Gilroy, P.E.
– Stantec
Maegan Crowley
– Stantec
Mackenzie Kersbergen, P.E.
– Maine Department of Transportation
Environmental
10:50 AM – 11:10 AM
East Coast USA Time
Cruise Shore Power Study: Addressing Challenges of Public Utility Providing Power in an Urban Area
Nathan Andrew Watson, P.E., M.ASCE
– KPFF Consulting Engineers
Mark Longridge, P.E., M.ASCE
– Port of Seattle
Environmental
11:10 AM – 11:30 AM
East Coast USA Time
The Port of Tomorrow: Energy Aggregator in a Decarbonized World
Christopher A. Ralph, BA.h (he/him/his)
– Norda Stelo
Jonathan Brodeur, Eng PhD
– Norda Stelo
Environmental
11:30 AM – 11:50 AM
East Coast USA Time
Harbouring Sustainability: Assessing Maritime Fender Systems' Carbon Footprint for Sustainable Ports
Dominique Polte
– ShibataFenderTeam Inc.
Environmental
10:30 AM – 12:00 PM
East Coast USA Time
9E: The New ASCE 61-25: Standard for Seismic Design of Piers and Wharves
Gayle S. Johnson, P.E.
– Simpson Gumpertz & Heger Inc. (SGH)
10:30 AM – 12:00 PM
East Coast USA Time
The New ASCE 61-25: Standard for Seismic Design of Piers and Wharves
Gayle S. Johnson, P.E.
– Simpson Gumpertz & Heger Inc. (SGH)
Marc I. Percher, P.E.
– GHD
Jhon P. Smith, Ph.D., P.E., S.E., M.ASCE
– Seattle University
Stuart Stringer, P.E., S.E.
– Moffatt & Nichol
Stephen E. Dickenson, Ph.D., P.E., BC.PE., M.ASCE
– New Albion Geotechnical
Nason McCullough, Ph.D., P.E., G.E., M.ASCE
– Jacobs
Julie A. Galbraith, P.E.
– Simpson Gumpertz & Heger Inc.
Brett W. King, P.E., SE
– WSP USA, Inc.
Carlos E. Ospina, PhD, P.E.
– Simpson Gumpertz & Heger Inc.
10:30 AM – 12:00 PM
East Coast USA Time
9G: Ports 101 - Sustainability and Resiliency
Stephen C. Owen, P.E., M.ASCE
– Marine Solutions, Inc.
10:30 AM – 10:50 AM
East Coast USA Time
Offshore Wind Introduction
Aaron K. Porter, P.E., M.ASCE
– Mott MacDonald
Jennifer Lim, P.E. (she/her/hers)
– Moffatt & Nichol
Ports 101
10:50 AM – 11:10 AM
East Coast USA Time
Tsunami Resilience
Andre Barbosa
– Oregon State University
Ports 101
11:10 AM – 11:30 AM
East Coast USA Time
Climate Change and SLR for Master Planning
Austin Becker, Ph.D.
– University of Rhode Island
Ports 101
11:30 AM – 11:50 AM
East Coast USA Time
Resilience and Master Planning / ECRB perspective
Rod K. Iwashita, P.E., D.PE, F.ASCE (he/him/his)
– GHD
Ports 101
1:00 PM – 5:00 PM
East Coast USA Time
Exhibitor Move-out
1:00 PM – 5:00 PM
East Coast USA Time
Short Course: Stronger Teamwork and Project Delivery Through Lean Design
Ryan Couto, P.E., LEED AP, PMP, LBBP
– WSP
Alison Lunny
– WSP
1:00 PM – 5:00 PM
East Coast USA Time
Technical Tour: Port of Davisville | Quonset Development Corporation (landside tour)
Back to Top