Skip to main content
Toggle navigation
Search
Home
Type here to filter the list
Monday, Jun 2nd
1:30 PM – 1:50 PM
East Coast USA Time
Innovative Design, Phasing and Packaging to Redevelop 87 Acres at Barbours Cut Terminal
Ian D. Sequeira, P.E., MTOP
– AECOM
Adam Sisson, P.E.
– AECOM
Terminal Planning & Design
Monday, Jun 2nd
1:50 PM – 2:10 PM
East Coast USA Time
Development of New DOD 'Hybrid' General Purpose/Repair Pier Type Category
James P. Connolly, P.E., SE, BC.PE
– COWI North America, Inc
Anthony L. Farmer, P.E., M.ASCE
– NAVFAC Atlantic
Terminal Planning & Design
Monday, Jun 2nd
2:10 PM – 2:30 PM
East Coast USA Time
Multidisciplinary Grant-Funded Barge Dock Expansion Within a Busy Operating Public Oil Terminal
Jyotirmoy Sircar, P.E.
– WSP USA Inc.
Sahar Sima, PhD, P.E., PMP
– WSP USA Inc.
Natasha Fudge, P.E.
– Port of Corpus Christi Authority
Jacob Morales, P.E.
– Port of Corpus Christi Authority
Terminal Planning & Design
Monday, Jun 2nd
2:30 PM – 2:50 PM
East Coast USA Time
Challenges in Design-Build a Vertical Breakwater/Quay for a New Bulk Terminal in Oceanic Conditions
Georgios Iason Koutsourelakis
– Archirodon N.V.
Nikolaos Diplarakos
– Archirodon N.V.
Georgios Fountoulis
– Archirodon NV
Terminal Planning & Design
Monday, Jun 2nd
3:50 PM – 4:10 PM
East Coast USA Time
Portsmouth Marine Terminal Offshore Wind Staging Port Planning and Design
Sean Jessup, P.E.
– Moffatt & Nichol
Paul Johnston
Jeff Fisher, P.E.
– Virginia Port Authority (VPA)
Terminal Planning & Design
Monday, Jun 2nd
3:50 PM – 4:10 PM
East Coast USA Time
Terminal Island Maritime Support Facility: A New Container Terminal at the Port of Los Angeles
Chris Morton, P.E.
– Port of Los Angeles
Terminal Planning & Design
Monday, Jun 2nd
4:10 PM – 4:30 PM
East Coast USA Time
New Auto Import Pier Designed for SPMTs Readies Rhode Island for Offshore Wind Support
Jyotirmoy Sircar, P.E.
– WSP USA Inc.
Joseph Choi, P.E.
– Crowley
Gregory Coren, P.E.
– Quonset Development Corporation
Max Gates
– Manafort Transit
Terminal Planning & Design
Tuesday, Jun 3rd
8:30 AM – 8:50 AM
East Coast USA Time
State-of-the-Art Design Solution for Multipurpose Wharf in Seismic and Hurricane Activity Zone
Carlos E. Ospina, PhD, P.E.
– Simpson Gumpertz & Heger Inc.
Alfredo Rivera, P.E., ENV SP
– Simpson Gumpertz & Heger Inc.
Manfred Zinserling, P.E., SE, M.ASCE
– Manfred Zinserling
Aaron D. Goldberg, P.E., BC.GE, M.ASCE
– S&ME
Jordan Lagnado
– Soletanche Bachy
Carlos A. Ortega, Ph.D., P.E.
– Simpson, Gumpertz & Heger
Terminal Planning & Design
Tuesday, Jun 3rd
8:50 AM – 9:10 AM
East Coast USA Time
New PIANC Guidelines for Design of Marine Terminals for Clean Alternative Fuels and Cargoes
Ron Heffron, P.E., BC.P.E., F.ASCE
– GHD
Terminal Planning & Design
Tuesday, Jun 3rd
10:50 AM – 11:10 AM
East Coast USA Time
Passenger Boarding Bridge Planning for Cruise Operations at PortMiami
Desi Maldonado, P.E. (he/him/his)
– AtkinsRéalis
Helga Sommer, P.E.
– PortMiami
Carlos Arboleda, P.E.
– AtkinsRéalis
Philip J. Hadfield, P.E., M.ASCE
– AECOM
Terminal Planning & Design
Tuesday, Jun 3rd
11:10 AM – 11:30 AM
East Coast USA Time
Portland (Maine International Marine Terminal Western Yard Expansion
Tristan P. Donovan, P.E., ENV SP, WEDG, M.ASCE
– Jacobs
Craig Morin, P.E.
– Jacobs
Matthew Burns
– Maine Port Authority
Terminal Planning & Design
Tuesday, Jun 3rd
1:50 PM – 2:10 PM
East Coast USA Time
A Novel Construction Method for Deployment of Offshore Wind Spars Using Existing Port Infrastructure
Onder Akinci, Ph.D, P.E., M. ASCE (he/him/his)
– Simpson Gumpertz & Heger
Ioannis Kalpakidis, Ph.D., P.E.
– Simpson Gumpertz & Heger
Devin Huber, P.E., PhD (he/him/his)
– AISC
Ali Naeem, P.E.
– Simpson Gumpertz & Heger Inc.
Terminal Planning & Design
Tuesday, Jun 3rd
2:10 PM – 2:30 PM
East Coast USA Time
Design and Planning of Pier Wind a Floating Offshore Wind Port Terminal
Jennifer Lim, P.E. (she/her/hers)
– Moffatt & Nichol
Suzanne Plezia, P.E. (she/her/hers)
– Port of Long Beach
Clint Herrera, P.E.
– Port of Long Beach
Miguel Angel Hernandez
– Port of Long Beach
Matt Trowbridge, P.E., SE, P.Eng. (he/him/his)
– Moffatt & Nichol
Terminal Planning & Design
Tuesday, Jun 3rd
2:30 PM – 2:50 PM
East Coast USA Time
Improving Fall Protection in Marine Terminals
Justin Reynolds, P.E., M.ASCE (he/him/his)
– Simpson Gumpertz & Heger Inc.
Duncan McFarlane
– Shell
Rick Roper
– Shell
Gayle S. Johnson, P.E.
– Simpson Gumpertz & Heger Inc. (SGH)
Jessica Hoffman
– Shell Trading & Supply Operations
Terminal Planning & Design
Tuesday, Jun 3rd
3:30 PM – 3:50 PM
East Coast USA Time
Port Canaveral Cruise Terminal 4 Berth - Value Added Design of a Modern Wharf
Tomas A. Montemayor, P.E., SE
– Jacobs Engineering Solutions
Patrick Hammond, P.E.
– Canaveral Port Authority
Songtao Yang, P.E.
– Jacobs
Shannon C. Clarke, M.ASCE
– Mott MacDonald
Terminal Planning & Design
Tuesday, Jun 3rd
3:50 PM – 4:10 PM
East Coast USA Time
Performance-Based Design of Movable Bridge to Incorporate Sea-Level Rise
Srikanth Sree Ramoju, Ph.D.
– Washington State Department of Transportation
Jeri Bernstein, P.E., SE
– Washington State Ferries
Terminal Planning & Design
Tuesday, Jun 3rd
4:10 PM – 4:30 PM
East Coast USA Time
Port Aransas Ferry Terminal - Rehabilitation and Upgrade
Robin Warrick, P.E.
– LJA Engineering
Niko Kalos, P.E. (he/him/his)
– LJA Engineering
Terminal Planning & Design
Wednesday, Jun 4th
8:30 AM – 8:50 AM
East Coast USA Time
Considerations for the Design of Fully Automated Container Yards Based on a Case Study
Alfredo Rivera, P.E., ENV SP
– Simpson Gumpertz & Heger Inc.
Justin Reynolds, P.E., M.ASCE (he/him/his)
– Simpson Gumpertz & Heger Inc.
Julian Rosales
– Instrumentacion Tecnica
Carlos E. Ospina, PhD, P.E.
– Simpson Gumpertz & Heger Inc.
Manfred Zinserling, P.E., SE, M.ASCE
– Manfred Zinserling
Terminal Planning & Design